Tumbler Ridge consults residents on design of its new high school, one year after the shooting
Two design options are on the table for the replacement school. The board chair hopes residents can help shape the building students will use for years.
The day's top stories, food & events — every morning at 7. Unsubscribe anytime.
Residents of Tumbler Ridge have two weeks to say which kind of school they want. The school board has narrowed the replacement building to two options: a pre-fabricated design, largely built off-site and assembled on-site, and a site-built design. The board will decide after the consultation closes, with a decision expected by late winter.
The former school was demolished after a mass shooting in February that killed six people, including the 18-year-old gunman, who also killed her mother and half-brother at their home. Demolition began in July, after then-Premier David Eby said students could not return to the building.
Chad Anderson, board chair for School District 59 (Peace River South), said the district is taking design concepts to the community. "Hopefully, we can choose from the best features available to create a really beautiful new facility that students and staff will feel both safe and comfortable in for the long term in Tumbler Ridge," he said.
The consultation includes a survey of Tumbler Ridge residents. Federal and provincial governments are each pledging $100 million, $200 million combined, for the new secondary school and modernization of the Tumbler Ridge health-care centre. The district says the new school will include a gymnasium sized for the school and the wider community, and a trades workshop with the same or better functionality.
Target construction start is summer 2027, depending on the chosen method.