High Level Bridge west sidewalk closes for emergency drainage repairs
The west side of the historic bridge will be offline until July 23 for work on damaged drainage infrastructure caused by recent heavy rainfall.
The day's top stories, food & events — every morning at 7. Unsubscribe anytime.
The west sidewalk on Edmonton's High Level Bridge will close at noon on Monday, July 20, for emergency repairs to damaged drainage infrastructure and slope erosion caused by recent heavy rainfall.
The closure is expected to remain in place until July 23. The work comes after repairs to the bridge's east sidewalk, which reopened on July 17. However, the section between the southeast staircase and Saskatchewan Drive remains closed until further notice.
Pedestrians can use the east staircase to access the river valley trail system or cross to the west side using available stair connections to 109 Street. Those travelling between downtown and the south side are encouraged to use the Walterdale Bridge or Menzies LRT Bridge as alternate crossings.
The facts
When does the High Level Bridge west sidewalk close?
The west sidewalk on Edmonton's High Level Bridge closes at noon on Monday, July 20, 2026, for emergency drainage repairs.
When will the west sidewalk reopen?
The High Level Bridge west sidewalk is expected to reopen on July 23, 2026.
Why is the west sidewalk closing?
The High Level Bridge west sidewalk is closing to repair damaged drainage infrastructure and slope erosion caused by recent heavy rainfall.
What part of the east sidewalk remains closed?
The section of the High Level Bridge's east sidewalk between the southeast staircase and Saskatchewan Drive remains closed until further notice.