O-Train Lines 2 and 4 shut down all weekend for maintenance
Replacement buses will run on the usual routes Saturday and Sunday as the transit authority conducts track inspections and tunnel work.
The day's top stories, food & events — every morning at 7. Unsubscribe anytime.
O-Train Lines 2 and 4 will be closed Saturday, June 13 and Sunday, June 14 for scheduled maintenance, with replacement buses operating instead.
Line 2 runs between Bayview and Limebank stations; Line 4 serves the Airport to South Keys route. The R2 bus will replace Line 2 every 12 minutes, while Route 105 and additional buses will cover Line 4 every 15 minutes. OC Transpo staff will be stationed at key locations to help riders navigate the changes.
The City of Ottawa scheduled the closures for the weekend because ridership is lower and disruption will be minimized for customers. The maintenance includes an end-to-end track inspection and work within the Dow's Lake Station tunnel to ensure system safety.
If you rely on those lines for weekend travel, plan ahead—the buses are your route this Saturday and Sunday.